The remedial works at this site were undertaken to create a more integrated look with the Kimpton Seafire Resort and Spa, most notably removing the thatch roof and demolishing the high-pitch roof structure.

We determined that the safest, most efficient way to remove the existing roof was to reinforce the roof structure and utilize a crane to lift the building's structure and place it on. Once the structure was safely on the ground, we were able to disassemble it with minimal fall risk.

Upon safely and efficiently removing the dated roof, we re- framed the new roof, installed standing-seam roofs on all 5 additional structures, and re- painted / re-stained all surfaces.

Key quantities and scope of work

- Highly public project with major safety considerations
- Extensive inspections and coordination with client’s safety teams
- Weeks of planning and preparation leading up to lift
- Engineering services including Crane Plan
- 8 days of on-site preparation work for 7-minute lift
- Over 20,000 square feet of painting and staining

Client Representative: Jordan Tranel
Start Date: July 2018
Duration: 3 months
Forecast Completion Date: October 2018
Delivered on time